Sign In | Join Free | My xuijs.com
China 3tech corporate limited logo
3tech corporate limited
Always the Pride
Active Member

5 Years

Home > Prefabricated Data Center >

Combined 40ft Prefabricated Data Center , DCIM Modular Data Center Construction

3tech corporate limited
Contact Now

Combined 40ft Prefabricated Data Center , DCIM Modular Data Center Construction

Brand Name : LionRock

Model Number : All-in-one combined 40ft

Place of Origin : Dongguan China

Payment Terms : TT

MOQ : negotiate

Price : negotiate

Packaging Details : export packing

Delivery Time : negotiate

DCIM : OwlEye

Container Dimensions : 12192 x 2438 x 2896

Container Weight (Fully Equipped) : <25

Access Control : Electronic lock with IC card reader

Working / Storage Temperature: °C : -20 to 453 / -40 to 70

Contact Now

Combined 40ft All-in-one Prefabricated Data Center

Power Module1

The power module is a single ISO40HC container with four levels of power capacity that can be upgraded from the basic configuration to
480kW ICT load capacity in steps of 120kW each. Internal arrangement has been designed to allow the upgrade by installing additional power
equipment. Multiple Power Modules can be combined to support even high ICT load.

ICT Module1

Two ICT module designs are available to suit different cabinet depth. They can be combined in different configurations to meet various
operation requirements. Expansion is easy just by adding more modules. Combined with the Power module, there is always a configuration
that meet your requirement.

Combined 40ft Prefabricated Data Center , DCIM Modular Data Center Construction

General Specifications

Fire Protection Type Automatic fire detection (smoke and heat) with
gas suppression system (HFC-227ea)
Monitoring and
Management
Access Control Electronic lock with IC card reader
Monitoring Video: Infrared IP cameras
Data: PDF, UPS, DC, A/C, Temp & Hum, fire protection, access control and ventilation
HMI Touch screen
Remote Access Web, App
Notification SMS, email
DCIM OwlEye
Structure Container Dimensions (W x D x H): mm 12192 x 2438 x 2896 (ISO40HC)
Container Weight (Fully Equipped): T <25
Protection Level IP552
Environmental
Conditions
Working / Storage Temperature: °C -20 to 453 / -40 to 70
Humidity: % 5 to 95
Altitude: m ≤4000 (derating start >1000)
Corrosion Class C (500m away from seashore)

Notes:

1 - Consult 3Tech for customized versions with Tier 3 reliability level or different ICT design load.

2 - Optional IP65 protection level.
3 - Optional maximum temperature up to 55°C.


Product Tags:

40ft Prefabricated Data Center

      

Combined Prefabricated Data Center

      

DCIM Modular Data Center Construction

      
Best Combined 40ft Prefabricated Data Center , DCIM Modular Data Center Construction wholesale

Combined 40ft Prefabricated Data Center , DCIM Modular Data Center Construction Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: 3tech corporate limited
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0